Work completed

5 / 25
20 items to complete

Total paid

₹1,54,269.25Labor & support ₹81,290.00 · Materials ₹72,090.25 · Other ₹889.00

Days on site

20 days44 worker attendances · 14 days absent

Laborer-hours on site

318h 47mFrom recorded arrival-to-departure windows

Inspected & signed off

0 / 255 completed, awaiting inspection
Loading Google Sheets…

All interior work 25

Flagged = priority work
Update status16Committed0In progress4Completed5Inspected0
01
Photo / design
In progress — 95% complete. Final check planned for 26 Oct 2026. TOP PRIORITY. Rectification of the gaming room sliding door.
In progress · 95%
02
Photo / design
In progress — 95% complete. Final check planned for 26 Oct 2026. TOP PRIORITY. Rectification of the guest bedroom hidden door and groove alignment.
In progress · 95%
03
Photo / design
In progress — 40% complete. TOP PRIORITY. Rectifying the size of the master bedroom gas geyser and softener unit.
In progress · 40%
04
Photo / design
Update status
05
Photo / design
Update status
06
Photo / design
Door laminate replacement completed for both bathrooms, confirmed by Rohit on 15 Oct 2026; completed about two weeks earlier (exact date not specified). Separate scope retained from 27 Sep: guest bathroom door installation and frame (Vascal) lamination were pending; completion of those separate works has not been reconfirmed.
Completed
07
Photo / design
Update status
08
Photo / design
Update status
09
Photo / design
In progress — 30% complete. HIGH PRIORITY. Completing the drawer for the gaming room lift-up unit.
In progress · 30%
10
Photo / design
Completed — confirmed by Rohit on 27 Sep 2026. Previous progress (23 Sep): Door and old laminate removed, new laminate applied, and counterweights placed while the adhesive set.
Completed
11
Photo / design
Update status
12
Photo / design
Dimension unit not specified.
Update status
13
Photo / design
Update status
14
Photo / design
Update status
15
Photo / design
Update status
16
Photo / design
Update status
17
Photo / design
Update status
task-acd4e02015771221eb6b874aa86bb46ddc25d40a7e48c381d3b60a9dc7c3bd6d
Photo / design
Update status
19
Photo / design
Wallpaper section/unit measured end-to-end: 610 mm W × 1,943 mm H (2 ft W × 6 ft 4.5 in H). Approximate area: 1.185 m² (12.75 sq ft). Use 610 mm W × 1,943 mm H for ordering and planning.
Update status
20
Photo / design
Completed — confirmed by Rohit on 25 Oct 2026. Existing bottle pull-out replaced with a new, larger unit.
Completed
21
Photo / design
Completed — confirmed by Rohit on 25 Oct 2026. Old bottle pull-out installed below the sink for detergent storage.
Completed
22
Photo / design
Update status
23
Photo / design
Completed — confirmed by Rohit on 25 Oct 2026. Oven grill replaced with a new one.